Concrete curb and curb and gutter details.
City of houston curb and gutter detail.
02754 04 existing proposed curb level sidewalk conditions.
City of laredo standard technical specifications manual appendix a 2013 edition rev.
02771 01 curb curb and gutter and header.
02754 02 driveways with culverts or valley gutters on open ditch type streets.
Types i 6 i 8 ii 24 gutter pan iii 6 iii 8 ac dike and traffic bars curb type ii 12 gutter pan and gutter transition gutter transition detail sheet not used mountable curb for fire truck access only valley gutter at street intersection.
A curb and gutter street must be depicted on the site plan with double lines representing the curb and labeling the edge of the pavement for indication.
For existing asphalt pavement with 6 monolithic standup curb and gutter saw cut curb and gutter a minimum of 1 deep and remove it the width of the proposed driveway from end of radius to end of radius.
If necessary these specifications may be deleted or revised by the city of san antonio or its representative using the special specifications general or special conditions and.
Curb gutter and sidewalk standard details 1 sheet 2015 05 01 pedestrian curb ramp standard details 4 sheets 2013 01 21 driveway standard details 3 sheets 2015 01 26 concrete pavement standard details 1 sheet 2015 01 26.
Cptd ftw concrete pavement terminus details.
Curb and gutter street.
The existing ditch must be shown on the site plan label the centerline and high banks of the existing ditch.
Appendix standard typical details no.
As of june 1 2008 all construction shall meet the requirements as set forth in the city of san antonio s standard specifications for construction dated june 2008.
Cdd ftw concrete driveway details.
Houston public works engineering services right of way 1002 washington ave 2nd floor houston tx 77002.
02754 01b driveway detail with 6 curbed streets.
02754 03 proposed sidewalk through driveway with excessive elevation difference.
Combined parallel perpendicular curb ramps separated sidewalk with physical obstruction curbs.
For the construction of a new driveway and or sidewalk.
Epoxy 3 dowels a minimum of 6 into existing curb and gutter at saw cut section if 6 of reinforcing steel is not exposed.
Cp tep ftw concrete pavement ties to existing pavement.
To schedule an inspection please call.
Permit is valid for one year.
And for extending the driveway.
Title of drawing water.
For removing and replacing an existing driveway sidewalk and or curb gutter.
Drawings 02754 03 to 02754 04.